
Custodian Selects Aqua As Premier Cooling Partner For Integrated Free Cooling System
The Client – Custodian Data Centres The Challenge – Cooling System For New 10MW Data Centre Facility The Solution – Highly Energy Efficient Closed Loop
The Client – Custodian Data Centres The Challenge – Cooling System For New 10MW Data Centre Facility The Solution – Highly Energy Efficient Closed Loop
The Client – Leading Packaging Manufacturer The Challenge – Issues Reaching Desired Process Temperature During Warmer Weather The Solution – Cooling System Incorporating Chiller, Free
The Client – Major Cosmetics Brand The Challenge – Production Hindered by Temperature Fluctuations & Waste Water Concerns The Solution – Isolated Heating & Cooling
The Client – Global Glass Manufacturer The Challenge – Manufacturing Continuity During Production Facility Upgrade The Solution – Energy Efficient Temporary Adiabatic Cooling System Timed
The Client – Leading UK Supermarket Chain The Challenge – Temperature Control for Chilled Food Automation Trial The Solution – Hire System Including Chiller,
The Client – Leading UK Food Producer The Challenge – Temporary Distribution Sites Needing Heating The Solution – Indirect Oil-fired Heating Solution & Fuel Management
The Client – Midlands Based Medical Equipment & Logistics Supplier The Challenge – Critical Cooling For MRI Scanners The Solution – Bespoke Cooling System Supplied
The Client – Leading Energy Management & Solution Provider The Challenge – Testing Fuel Generation Plant Project The Solution – Heat Rejection Package On A
The Client – Student Accommodation Provider, Central London The Challenge – Hall Of Residence Boiler House Maintenance The Solution – Planned Maintenance Solution – Short-term
Often with hire installations time is of the essence and customers are keen to get equipment delivered to site as soon as possible. However, for a client working within the defence sector, the highly sensitive and critical nature of their application meant that technical expertise and attention to detail were paramount, with a complex design stage lasting 10 months… Read More
The Client – The National Trust, Ham House The Challenge – Boiler Failure The Solution – Short-Term Boiler Hire Ham House is a historic National
The Client – Construction Company The Challenge – Running Underfloor Heating System At First Fix Stage The Solution – Dual Fuel Boiler On Short Term
Check out industry news, success stories and more.
Unit 6 Brickfield Lane
Chandler’s Ford
Industrial Estate
Eastleigh Hampshire
SO53 4DP
Registration no. 13262716
VAT No. 382720395